摘要
介绍高坝洲水电厂计算机监控系统改造工程的设计、结构、配置、功能,与原系统的差异以及安装调试,以期对其他水电厂监控系统的改造项目具有一定的借鉴意义。
The design, structure, configuration and function of renovation project of computer monitor system in Gaobazhou Hydropower Station, as well as the differences between original and later systems, the installation and debugging are introduced. It is expected to provide reference to similar project.