期刊文献+

BIM技术的应用障碍及对策分析 被引量:68

Barrier and Countermeasures of the BIM Application in China
下载PDF
导出
摘要 BIM技术作为一种有效的建筑建模工具和建筑信息集成工具,引领了全球建筑信息化的快速发展,自BIM技术进入我国建筑行业以来也对我国建筑业信息化的发展起到了积极的推动作用,但由于BIM推行中出现的障碍和问题,BIM技术在我国的发展程度还远远不够。本文在文献研究的基础上,总结分析了BIM在我国实施的障碍;通过网络发放和现场发放两种方式对国内工程项目团队进行问卷调查,利用问卷回收的数据对本文提出的障碍进行验证和分析:首先对这些障碍进行了KMO和Bartlett以及因子分析;然后利用主成分分析对这些指标进行分析,研究得出了BIM技术在我国建筑行业发展所面临的主要障碍因素;最后,根据分析结果提出了相应的解决措施,从而为BIM在我国成功实施提供参考。 As an effective tool for architectural modeling and building information integration, BIM is leading the rapid development of global building informatization. Since BIM is brought into to the Chinese construction industry, the informatization of our country construction gets a actively promotion. But the development degree of BIM in China is still low, because there are so many obstacles and problems during the promotion process of BIM. Therefore, based on extensive literature review, this paper summarizes the factors considering the characteristic of BIM, and conducted the questionnaire survey to check and analysis the factors we summarized. First we explored the KMO and Bartlett inspection and the factor analysis. Then we find out the main obstacle factors when BIM is promoted in the construction industry in China by exploring the principal component analysis. According to the results of analysis, we make suggestions to contribute to the success of the BIM implementation.
出处 《土木工程与管理学报》 2013年第3期65-69,85,共6页 Journal of Civil Engineering and Management
基金 国家自然科学基金(71272146)
关键词 建筑信息模型(BIM) 障碍研究 对策分析 因子分析 building information modeling(BIM) disability study countermeasure analysis factoranalysis
  • 相关文献

参考文献17

  • 1Azhar S, I-lein M, Sketo B. Building Information Mod- eling ( BIM ) : Benefits, Risks and Challenges [ C ]// Proceedings of the 44th ASC National Conference. 2008.
  • 2住房和城乡建设部.2011-2015年建筑业信息化发展纲要[R].北京:住房和城乡建设部,2011.
  • 3National Institute of Building Sciences. United States National Building Information Modeling Standard, Ver- sionl [ R]. USA: National Institute of Building Sci- ences ,2007.
  • 4The American Institute of Architects. Integrated Project Delivery: A Guide[ M]. USA: The American Institute of Architects, 2007.
  • 5Olofsson T, Lee G, Eastman C. Editorial-Case studies of BIM in use [ J]. IT in Construction, 2008, 13: 244-245.
  • 6Carmona J, Irwin K. BIM: who, what how and why [J/OL]. [2012-7-15]. http:// www. facilitiesnet. corn/software/article/BIM -who-what -how-and-why- 7546#.
  • 7Hardin B. BIM and Construction Management: Proven Tools, Methods, and Workflows [ M ]. Canada: John Wiley & Sons, 2011.
  • 8Glick S, Guggemos A. IPD and BIM: Benefits and Opportunities for Regulatory Agencies [ C ]//Proeeesi- ngs of the 45th Associated Schools of Construction (ASC) Annual Conference, Gainesville, FL, 1-4 A- pril. Pacific Northwest National Laboratory ( PNNL), 2009.
  • 9Sacks R, Koskela L, Dave B A, et al. Interaction of lean and building information modeling in construction [JJ. Journal of Construction Engineering and Manage- ment, 2010, 136(9) : 968-980.
  • 10Singh V, Gu N, Wang X. A theoretical framework of a BIM-based multi-disciplinary collaboration platform [ J]. Automation in Construction, 2011,20(2) : 134- 144.

二级参考文献26

  • 1张昆.基于BIM应用的软件集成研究[J].土木建筑工程信息技术,2011,3(1):37-42. 被引量:28
  • 2过俊.BIM在国内建筑全生命周期的典型应用[J].建筑技艺,2011(1):95-99. 被引量:141
  • 3张明媛,袁永博.论虚拟仿真技术与群体支持系统在工程管理中联合应用[J].建筑管理现代化,2005,19(1):26-29. 被引量:3
  • 4Lichting W.A., The Integrated A- greement for Lean Project Delivery [J], Contract Forms/Project Management, 2006, 26(3):25-32.
  • 5Zhang Y., Guangbin W.. Cooperation between Building Information Modeling and Integrated Project Delivery Method Leads to Paradigm ShiR of AEC Industry [J], Management and Service Science, 2009:1-4.
  • 6Kenig M., Allison M., Black B. et al. Integrated project delivery for public and private owners [EB/OL], www.agc. org/projectdelivery, 2010-09.
  • 7Novitski B.J.. New AIA agreement support integrated project delivery [EB/OL], http://archrecord.construction. com/practice/proj Delivery/0807aia.asp, 2008-07.
  • 8David A., Vashali A.. IPD: The AIADelivers a Multi-Party Agreement [EB/OL], http://www.zdlaw.corn/enews/2010/integrated-proj ect-delivery-ipd.php, 2010-02.
  • 9PatrickJ. O'Connol; Jr, Integratedproject delivery, collaboration through new contract forms[EB/OL], http://www.acecmn.rg/contents/file/194,2009-01 - 15.
  • 10R. Sacks, R. Barak. Teaching Building Information Modeling as an Integral Part of Freshman Year Civil Engineering Education [J]. Journal of Professional Issues in Engineering Education and Practice, 2010(1):30-38.

共引文献954

同被引文献384

引证文献68

二级引证文献486

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部