复杂地质条件下大采高综采设备的适应性研究 被引量:2

Study of Adaptability to Large Mining Height Fully-mechanized Equipment Under Complex Geological Condition
下载PDF
导出
摘要 东庞矿2612工作面地质条件极其复杂,6.5 m采高、煤层夹矸、大倾角和俯、仰采。尤其仰采时片帮冒顶严重,顶板难以控制,采煤极其困难。通过对采煤机、刮板输送机、顺槽带式输送机等配套设备进行一系列的适应性研究改造,综采设备逐渐适应了复杂的地质条件,实现了高产高效。 2612 coal face has extremely complex geological conditions in Dongpang coal mine, such as 6.5 meters height,coal with waste rock,large dip angle and upward mining,downward mining, especially in upward mining, the wall and roof controlling and coal mining is extremely difficult. By a series of studies on the adaptation of transforming, such as scarer,scraper conveyor and belt conveyort, fully-mechanized mining equipment gradually adapted to the complex geological conditions, realizing high production and high efficiency.
作者 翟荣涛
出处 《煤矿机械》 北大核心 2013年第9期205-206,共2页 Coal Mine Machinery
关键词 大采高 复杂地质条件 设备改造 适应性 large cutting height complex geological condition rehabilitation of equipment adaptability
  • 相关文献

参考文献4

二级参考文献13

共引文献95

同被引文献13

引证文献2

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部