期刊文献+

随机需求下基于库存责任期的装配系统准时供货模型 被引量:3

On time delivery model with vendor inventory liability period in assembly system with random demand time
原文传递
导出
摘要 以装配系统为研究对象,考虑在VMI模式下,当制造商采取设定库存责任期以抵御市场需求时间不确定的风险时,供应商的最优供货时间决策和制造商最优的库存责任期设置.文章分别建立了单供应商对单制造商和多供应商对单制造商的主从博弈准时供货模型,通过数学证明和遍历算法找到了供应链双方在不同模式下的最优选择.研究结果证明制造商并不应该选择过长的库存责任期,而供应商之间的不同步供货会对供应链整体造成巨大损失.并且通过对比集中与分散决策下的供应链绩效,给出实现系统协同的必要条件.最后通过算例分析进一步证明相关结论. Under VMI policy, manufacturer can use vendor inventory liability period to mitigate the risk caused by an uncertain demand time. This paper investigates the suppliers' optimal delivery times and manufacturer's vendor inventory liability period respectively in a decentralized assembly system setting. Building a basic model with a single supplier and an extend model consisted by multi-suppliers, the optimal choices for both parties have been figured out by both mathematical justification and sequential procedure. The results show that it is not wise for manufacturer to set a too long liability period, and the unsynchronized deliveries among suppliers can heavily hurt supply chain performance. Additionally, we provide the coordination mechanism and numerical example.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2013年第9期2220-2228,共9页 Systems Engineering-Theory & Practice
基金 国家自然科学基金重点项目(71231007) 国家自然科学基金(71072035 71071050)
关键词 装配系统 库存责任期 准时供货 供应链协同 assembly system inventory liability period on-time delivery coordination
  • 相关文献

参考文献19

  • 1Waller M,Johnson M E, Davis T. Vendor-managed inventory in the retail supply chainj.I],Journal of Business Logistics, 1999, 20(1): 183203.
  • 2Barnes E, DaiJ, Deng SJ, et al. On the strategy of supply hubs for cost reduction and responsiveness[C]/ / White Paper on Electronics Supply Chain, Georgia Institute of Technology and National University of Singapore, 2000.
  • 3Gerchak Y, Wang Y, Yano C A. Lot sizing in assembly systems with random component yieldsj.I]. lIE Transac?tions, 1994, 26(2): 1924.
  • 4Giiler M G, Bilgic T. On coordinating an assembly system under random yield and random demand[J]. EuropeanJournal of Operational Research, 2009, 196(1): 342350.
  • 5Xiao Y B, ChenJ, Lee C Y. Optimal decisions for assemble-to-order systems with uncertain assembly capacity[J]. InternationalJournal of Production Economics, 2010, 123: 155 165.
  • 6Yano C A. Stochastic lead times in two-level assembly systemsj.I], lIE Transactions, 1987, 19: 371378.
  • 7Tang 0, Grubbstrom R W. The detailed coordination problem in a two-level assembly system with stochastic lead timesl.I], InternationalJournal of Production Economics, 2003, 8182: 415429.
  • 8浦徐进,石琴,凌六一.多供应商准时制惩罚机制与激励机制研究[J].计算机集成制造系统,2006,12(11):1876-1880. 被引量:11
  • 9Iyer A V, Bergen M E. Quick response in manufacturer-retailer channels[J]. Management Science, 1997, 43(4): 559-570.
  • 10GroutJ R. A model of incentive contracts forJust-in-time deliveryl.I]. EuropeanJournal of Operational Research, 1996,96: 139-147.

二级参考文献26

  • 1Jahnukainen J,Lahti M.Efficient purchasing in make-to-order supply chains[J].International Journal of Production Economics,1999,59:103-111.
  • 2Gelinas R,Jacob R.Just-in-time purchasing and the partnership strategy[J].European Journal of Purchasing and Supply,1996,2(1):39-45.
  • 3Freeland J R.A survey of just-in-time purchasing practices in the united states[J].Production and Inventory Management Journal,1991,32(2):43-49.
  • 4Gunasekaran A.Just-in-time purchasing:An investigation for research and applications[J].International Journal of Production Economics,1999,59:77-84.
  • 5Hill Charles W L,Jones G R.Strategic Management Theory:An Integrated Approach[M].4thed,Houghton Mifflin,New York,1998.
  • 6Iyer A V,Bergen M E.Quick response in manufacturer-retailer channels[J].Management Science,1997,43(4):559-570.
  • 7Grout,John R,Christy,David P.An inventory model of incentives for on-time delivery in just-in-time purchasing contracts[J].Naval Research Logistics,1993,40(4):863-877.
  • 8Chapman S N.Just-in-time supplier inventory:An empirical implementation model[J].International Journal of Production Research,1989,27(12):1993-2007.
  • 9PAN A C,LIAO C.An inventory model under just-in-time purchasing agreements[J].Production and Inventory Management,1989,50(1):49-32.
  • 10GOLLAR D Y,SARKER B R.Economic manufacturing quantity in a just-in-time delivery system[J].International Journal of Production Reseach,1992,30(5):961-972.

共引文献18

同被引文献28

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部