期刊文献+

渤海油田分层注水管柱防卡及洗井工艺 被引量:14

Anti-sticking and Well Flushing Technology for Layered Injection String in the Bohai Sea
下载PDF
导出
摘要 为了解决海上注水井后期修井作业中管柱遇卡问题,开发了液压提升式防卡分层注水工艺。该工艺技术通过井下管柱提升装置和分层注水管柱相结合,实现注水井的分层配注和在不动井口的情况下活动管柱。现场应用结果表明,与常规注水井洗井工艺相比,该技术可以在一定程度上降低后期修井作业中管柱遇卡的概率,同时简化注水井洗井作业流程,节约了作业时间,降低了生产成本,满足了现场的急需,具有良好的经济效益和社会效益。 To solve the problem of string sticking in the later-stage workover operation in offshore water injection well, hydraulic lifting anti-stieking layered water injection technology was developed. Through the combination of string lifting device and separate layer injection string, the technology achieves layered injection allocation and mov- ing the string without moving the wellhead. The field application shows that compared with the well flushing technol- ogy of conventional water injector, the technology can, to some extent, reduce the probability of string sticking in the later-stage workover operation. Meanwhile, it simplifies the water flushing process of water injector, saving the operating time, reducing the production cost and meeting the urgent in-site needs.
出处 《石油机械》 北大核心 2013年第9期56-58,共3页 China Petroleum Machinery
基金 中海石油(中国)有限公司天津分公司项目"提式洗井工艺技术研究"(20110211)
关键词 分层注水 注水管柱 液压提升 防卡 洗井 layered water injection injection string hydraulic lift sticking prevention well flushing
  • 相关文献

参考文献6

二级参考文献15

共引文献62

同被引文献123

引证文献14

二级引证文献87

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部