大体量预应力结构后浇带施工优化探讨

Discussion on Engineering Optimization of Post-cast Strip of Large-volume Prestressed Structure
下载PDF
导出
摘要 沈阳某会展中心工程,裙楼屋面为预应力混凝土结构,总面积约23 300m2。设计有大量后浇带,并要求结构完成两个月后方可封闭,对工期影响非常巨大。为了达到计划工期目标,对预应力结构后浇带进行了设计优化。经论证方法可行,很大程度上提高了施工效率并降低了成本。 A convention and exhibition center in Shenyang applies prestressed concrete structure for its podium building roof, covering a total area of about 23 300 square meters. The design used a large number of post-cast strips and required that the belts wouldn't be sealed until two months after completion of the structure. This would have a very great impact on the construction period. In order to meet the planned construction period, design optimization was done on the post-cast strip of the prestressed structure. This method is proved to be feasible, it greatly improves the construction efficiency and reduces the cost.
作者 张英
出处 《建材世界》 2013年第4期37-39,共3页 The World of Building Materials
关键词 预应力结构 后浇带 施工缝 设计优化 节约工期 降低成本 prestressed structure post-cast strip construction joints design optimization save the construction time reduce the cost
  • 相关文献

参考文献6

二级参考文献13

共引文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部