摘要
在 5 0 0kV维坊—青岛送电线路工程中 ,采用RT -SKI技术和全数字摄影测量相结合 ,解决了工程中遇到的问题 ,提高了工作效率和经济效益。
It was adopted that the combine of RT-SKI with digital photogrammetric survey in 500kV Weifang—Qingdao aerial power transmission line engineering.The open to view be solved on engineering.It was promote that is labour efficiency and economic benefits.
出处
《电力勘测》
2000年第2期51-55,共5页
Electric Power Survey