3Esmeraldo P C V, Salgado F M, Carvalho. Surge propagation analysis: an application to the Grajau 500kV gas insulated substation[R]. Paris: CIGRE, 1988.
4Working Group 33/13-09. Very Fast Transient Phenomena Associated with Gas Insulated Substations[R], Paris: CIGRE, 1988.
5POVH D, Schimitt H. Modeling and analysis guidelines for very fast transient[J]. IEEE Transactions on Power Delivery, 1996, 11(4): 231-238.
6Lewis J, Pryor B M, Jones C J, et al. Disconnecter operations in gas insulated substation overvoltage studies and tests associated with a 420 kV installation[R]. Paris: CIGRE, 1988.
7Grandl J, Eriksson A, Meppelink J, et al. Studies of very fast transient (VFT) in a 765kV substation[R]. Paris: CIGRE, 1988.
8BargigiaA, Porrino A, Mazzoleni B, et al., Performance of metal clad disconnector and its impact on the insulation design of gas insulated substations[R]. Paris: CIGRE, 1988.
9Auriol Ph, Buret F, Helle G, et al. Dielectric withstand of SF6 stressed by steep fronted waves[R]. Paris: CIGRE, 1988.
10Luxa G, Kynast E, Pigini A, et al. Recent research activity on the dielectric performance of SF6, with special reference to very fast transients[R]. Paris: CIGRE, 1988.