摘要
介绍南宁港牛湾10#~13#泊位高桩梁板式码头施工控制网的布设,重点介绍码头施工基线的布设和用全站仪对码头上部结构控制的测量技术.实践表明,该技术能满足施工的精度要求,对内河高桩码头施工测量工作具有一定的指导意义.
This paper introduces the laying of construction control system of Niuwan 10# - 13# berth high-pile beam-slab wharf in Nanming port, focusing on the layout of pier construction baseline and pier superstructure with a total station control on the measurement techniques. Practice shows that the technology can meet the construction accuracy requirements and have important directive significance to the river high-pile wharf construction survey.
出处
《地矿测绘》
2013年第3期20-23,共4页
Surveying and Mapping of Geology and Mineral Resources
关键词
高桩梁板式码头
上部结构
施工测量
平面控制网
高程控制网
high-pile beam-slab wharf
superstructure
construction survey
horizontal control network
vertical control network