摘要
主要阐述了TW-2型驼峰自动化控制系统设备施工完成后,在不接入室外设备条件下,采用模拟条件对室内设备进行调试的方法、步骤、试验内容和要求,并对室内CIPS与TW-2联机调试中有关问题,和搭建TW-2系统环境常见问题的解决方法进行分析。
This paper mainly describes the method, procedure, test contents and requirements of testing and commissioning the indoor equipment without being connected to outdoor equipment by simulation after the equipment construction of TW-2 type humping automation control system has been completed. The test will not be connected to outdoor equipment. Meanwhile, it also analyzes some problems related to the jointed testing of the indoor CIPS and TW-2 as well as the solutions to common problems in building the environment for a humping automation control system.
出处
《铁道通信信号》
2013年第9期12-14,共3页
Railway Signalling & Communication