期刊文献+

地铁运营线路新旧信号系统过渡方案分析

Analysis of Signaling System Transition Plan for Subway Line in Operation
下载PDF
导出
摘要 北京地铁2号线自试运行至2008年开通已跨过了36年的历史,早期投入运营的信号系统由于各方面原因已远远无法满足现代地铁高效、稳定、安全运营的需要,急需新的信号系统的取代。在不影响既有运营线路运营的前提下,工程实施中如何顺利过渡是一个值得研究的问题。 Beijing Metro has passed more than thirty years since its commissioning. Early signaling system into operation could not satisfy the need of efficient, stable, and safe operation of the modern subway due to various reasons. It was required that a new signal system should replace the old one. Under the premise of not affecting the operation of existing lines, how to achieve a successful and smooth transition during the replacement has become a worthwhile problem for research.
作者 宋小鹏
出处 《铁道通信信号》 2013年第9期20-24,共5页 Railway Signalling & Communication
关键词 过渡 信号 系统 Transition Signal System
  • 相关文献

参考文献3

  • 1GB50157-2003地铁设计规范[S].北京:中国计划出版社,2003.
  • 2中国建设部.建标104-2008.城市轨道交通工程项目建设标准[S].2008.
  • 3邱奎.地铁既有线信号系统更新改造关键技术研究[S].中铁通信信号勘测设计(北京)有限公司,2010.

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部