摘要 为提高三山岛金矿采场回采效率,缩短采场回采的时间,经过研究矿山采用宽进路交替式盘区耦合开采技术,一步进路回采后接顶充填,二步进路回采后预留切割槽,为接续盘区的回采提供了空间。该技术满足了扩产要求,具有推广应用价值。 In order to increase the mining efficiency and shorten the stope mining time, the wide drift alternate panel coupled mining technology is adopted subject to discussions. The roof-contact filling is conducted after one-step drift stoping and cutting slot is reserved after two- step drift stoping to provide space for mining in splicing panel. Being able to satisfy the production expansion, this technology has popularization and application value.
出处 《矿业工程》 CAS 2013年第5期28-30,共3页 Mining Engineering
关键词 宽进路接续盘区 耦合开采 回采效率 s wide drift splicing panel coupled mining mining efficiency
  • 相关文献

参考文献6

  • 1钟义旒.金属矿床开采[M].北京:冶金工业出版社,1998.
  • 2修国林,何顺斌,于常先.三山岛海底采矿关键技术及最优开采方案研究[J].黄金科学技术,2010,18(3):9-13. 被引量:13
  • 3刘志君,龚浩源.上向水平分层充填采矿法的改进.第八届国际充填采矿会议论文集[c].2004:130~133.
  • 4范殿贵.改进采矿工艺 提高经济效益[J].矿业快报,2000(21):11-12. 被引量:2
  • 5韩春雨,刘玉勇.焦家金矿锚杆护顶大规格进路充填采矿法成果鉴定[c].会议论文,2011.
  • 6况丹阳,李勇,赵春玺.薄矿体垂直于走向的宽进路两步采矿方法应用与实践[C].会议论文.2012.

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部