利用原斜坡道与措施斜坡道贯通测量施工

Holing Through Survey by Using Existing Ramp and Measurement Ramp
下载PDF
导出
摘要 为了保证两井间巷道的顺利贯通,能够满足采矿生产的要求,做到不盲目追求高精度而增加测量工作量,又不会由于精度不够而造成不能贯通的严重后果。本文对贯通方案进行了合理的方案设计。为保证工程能够快速、准确地完成,并使工作量尽量减小的原则,特此进行了贯通测量的技术设计和误差预计。 To ensure the smooth breakthrough of the drift between two shafts and meet the requirements of mining production, it has to be accomplished that do not blindly pursue high precision while increase survey work amount and nor cause serious consequence of non- breakthrough due to insufficient precision. This paper presents the reasonable concept design for the breakthrough. In order to guarantee the project to be completed shortly and correctly and to minimize the work amount, the technical design of the holing through survey was conducted and the error was determined.
出处 《矿业工程》 CAS 2013年第5期52-53,共2页 Mining Engineering
关键词 贯通测量 水平重要方向 高程方向 允许偏差 误差预计 holing survey level important direction altitude direetion allowable deviation error determination
  • 相关文献

参考文献2

  • 1矿山测量学[M].北京:中国矿业大学出版社,2000(5).
  • 2矿山测量技术[M].北京:煤炭工业出版社,2001(10).

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部