摘要
简述石门水库导流泄洪隧洞的设计概况 ,介绍工程施工导流方案 ,泄洪隧洞设计、试验及采取的工程措施 ,并对利用导流隧洞改建的龙抬头泄洪隧洞的利弊进行分析。
The brief design conditions of the Shimen water reservoir diversion_spillway tunnel were accounted here.Its construction diversion scheme, spillway tunnel design, test and engineering measures were introduced. The advantage and drawback of spillway tunnel rebuilt from the diversion tunnel were analyzed,too.
出处
《广西水利水电》
2000年第4期25-27,39,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
石门水库
导流隧洞
泄洪隧洞
设计
龙抬头段
the Shimen water reservoir
diversion tunnel
spillway tunnel
design