合理设定船舶管加工负荷

下载PDF
导出
摘要 为了适应造船生产的需要,不影响舾装工程的正常推进,必须确保提前完成舾装时所需要装配的管子。同时考虑均衡化生产因素,必须事先设定好某一时间段内管加工负荷。
出处 《机械工程师》 2013年第10期29-31,共3页 Mechanical Engineer
  • 相关文献

参考文献5

二级参考文献9

  • 1胡适军.船舶动力装置安装丁艺[M].哈尔滨:哈尔滨工程大学出版社,2007.
  • 2Stefan Chanas,Adam Kasperski.Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters[J].Fuzzy Sets and Systems,2004,142:359
  • 3Stefan Chanas,Adam Kasperski.Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates[J],Engineering Applications of Artifical Intelligence,2001,14:377
  • 4Takeshi Itoh,Hiroaki Ishiii.Fuzzy due-date scheduling problem with fuzzy processing time[J].International Transactions in Operations Research,1999,6:639
  • 5Adam Kasperski.A possibilistic approach to sequencing problems with fuzzy parameters[J],Fuzzy Sets and Systems,2005,150:77
  • 6Paul M S,Russell E K,Jeff A J.Scheduling arrivals to a production system in a fuzzy environment[J],European Journal of Operational Research,1996,93:75
  • 7Wang Chengyao,Wang Dingwei,Ip W H,et al.The single machine ready time scheduling problem with fuzzy processing times[J],Fuzzy Sets and Systems,2002,127:117
  • 8王成尧,高麟,汪定伟.模糊加工时间调度问题的研究[J].系统工程学报,1999,14(3):238-242. 被引量:14
  • 9唐国春,张峰,罗守成,陈德伍.模糊加工时间排序问题的性质[J].运筹学学报,1999,3(4):84-94. 被引量:8

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部