摘要
以称钩河坝系流域降水、径流、泥沙和水土保持措施的5a监测统计数据为依据,Quick Bird卫星影像为主要数据源,在ArcGIS 9.3及Region Manager 5.5软件支持下,研究该坝系流域降雨变化和水保措施对径流和产沙量变化的影响,分析坝系水土保持措施拦沙效益。结果表明:2007—2011年间,水土保持措施建设是该流域径流和侵蚀产沙减少的主要原因,其中坡面治理措施面积增加133.04hm2,坝系流域总控制面积达到8 843.58hm2,占流域总面积的54.80%。坝控范围内年平均侵蚀模数为18.80t/km2,侵蚀模数减少5 581.20t/km2。
On the basis of observed data of 5 years of precipitation, runoff, slit and soil and water conservation measures as well as research in Chenggou Dam system watershed, QuickBird remote sensing images as the major information source, ArcGIS 9. 3 and RegionManager 5. 5, precipitation variation and soil and water conservation measures on runoff and sediment yield in the watershed were studied, the benefits of water and sediment interception under the conditions of different soil and water conservation measures were analyzed. Some results were gained as followings: from 2007 to 2011, soil and water conservation construction meas- ures is the main reason of runoff and sediment reduction, the area of countermeasures increased 133.04 hm2 , the control dam system watershed area reached to 8 843.58 hm2 , accounting for 54. 800//oo of the total basin. Annual average erosion modulus is 18.80 t/km2 in Chenggou Dam system watershed, erosion modulus re- duced by 5 581.20 t/km2.
出处
《水土保持研究》
CSCD
北大核心
2013年第5期13-17,共5页
Research of Soil and Water Conservation
关键词
水土保持
监测
侵蚀产沙
减水减沙
坝系流域
soil and water conservation
monitor
erosion sediment
water and sediment reduction
dam sys- tem watershed