工期与费用分别优化的实例研究 被引量:2

Study on Duration and Cost Optimization for Construction
原文传递
导出
摘要 运用传统方法进行工期-费用优化可以得到最优解,但工期与费用同时进行优化,其计算量很大,而启发式算法及各类智能算法能减小计算量,但不能保证是最优解。依据所分析的结合循环法与动态规划法的工期-费用优化原理,以青弋江特大四线客运专线桥1号块为研究对象,将工期与费用分别进行优化。 Duration and cost optimization for construction can get the optimal solution by using traditional methods, but need duration and cost optimization at the same time, a lot of calculation. Heuristic algorithm and various intelligent algorithms can reduce the amount of calculation, but can't guarantee to be the optimal solution. The principle of duration and cost optimization was analyzed from the cycle method and dynamic programming method. Based on the principle, duration and cost was optimized separately with the 1st block of Qingyi river bridge of large four-wire passenger as research object.
出处 《建筑经济》 北大核心 2013年第10期43-46,共4页 Construction Economy
关键词 工期优化 费用优化 循环法 动态规划法 优化分析 duration optimization cost optimization cycle method dynamic programming method optimization analysis
  • 相关文献

参考文献3

  • 1JGJ/T121-1999.工程网络计划技术规程[S].北京:中国建筑工业出版社.1999.
  • 2Rifat Sonmez. A hybrid genetic algorithm for the discrete time-cost trade-off problem[J]. Expert Systems with Appli- cations, 2012,39 (13).
  • 3孙伟峰,董福全,苏会德.网络计划工期优化在工程进度管理中的应用[J].山东冶金,2011,33(2):79-80. 被引量:3

二级参考文献3

  • 1中国建设监理协会.建设工程进度控制[M].北京:中国建筑工业出版社,2008.
  • 2Richard H.Clough.建筑项目管理[M].北京:机械工业出版社,2004.
  • 3曹吉明,徐伟.网络计划技术与施工组织设计[M].上海:同济大学出版社,1999.

共引文献2

同被引文献13

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部