摘要
苏联于1966年投运了超超临界参数СКР-100型火电机组,它作为中压机组的前置式机组,使电站发电煤耗降至315g/kWh.叙述机组的主要设备、热力系统、材料选择、汽轮机结构特点、启动和变工况运行、高压缸冷却系统、运行经验和展望等.
Type CKP-100 Ultra supercritical steam turbine, which were put into operation in USSR in 1966 and serve for topping intermediate pressure units.have reduced the plant coal consumption to 315g/kWh. The paper describes its main equipment, thermody-namic cycle, material selection, structural features of the turbine, starting-up and off design operation, the cooling system of the HP cylinder and operating experiences, as well as prospect of development.
出处
《动力工程》
CSCD
1991年第1期32-39,共8页
Power Engineering