摘要 一台65t/h煤粉炉,运行出力小于45t/h,经测试确认是因风扇磨出力低及风粉系统设计不合理所致.在对磨煤机分离器、入口干燥段、锅炉送粉系统、燃烧系统及给煤机调节装置进行改造后,磨煤机最大出力由4,8t/h增至8t/h.锅炉出力由最大47.6t/h增加至70.6t/h以上. The reason why the performance of a certain 65t/h pulverized coal boiler con't even match that of a 45t/h.pne is shown by tests to be dune to a inefficient fan mill and unreasonable design of the pulverizing system. An increase of the maximal output of the pulverizing mill from 4.8t/h to 8t/h and that of the boiler from ,49.6t/h to over 70.6 t/h were finally achieved after improving the mill separator,' the inlet drying section, the feeder system, the combustion system and the control system of the conveyer.
作者 张永兴
出处 《动力工程》 CSCD 1991年第1期27-31,共5页 Power Engineering