C80大体积高强混凝土夏季施工技术 被引量:3

Summer Construction of C80 High Strength Mass Concrete
下载PDF
导出
摘要 结合汉国城市商业中心工程,通过优化混凝土配合比、控制原材料入机温度及泵送温升等措施,确保强度及工作性能的同时,实现夏季施工混凝土入模温度≤35℃。通过实践,确定了C80混凝土的验收标准,并从浇筑方式及养护方法入手,减少了混凝土表面裂缝,提高了墙柱成型质量。 Combining with the project of Hanguo City Commercial Center, the concrete molding temperature is controlled in 35℃ in summer construction, meanwhile, the concrete strength and its working performance are ensured by taking the measures of optimizing the concrete mix proportion, controlling the materials machining temperature and the pumping temperature. The practice shows that the acceptance standard of C80 concrete is put forward, the concrete cracks are reduced, and the quality of walls and the columns are guaranteed from improving the pouring types and taking reasonable maintenance method.
出处 《施工技术》 CAS 北大核心 2013年第18期37-39,57,共4页 Construction Technology
关键词 混凝土 夏季施工 入模温度 养护 施工技术 concrete summer construction molding temperature maintenance construction
  • 相关文献

参考文献2

二级参考文献8

共引文献40

同被引文献14

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部