期刊文献+

求解一类异构并行机调度问题的分布估计算法 被引量:8

Estimation of distribution algorithm for a kind of heterogeneous parallel machine scheduling problem
下载PDF
导出
摘要 针对流程工业中广泛存在的一类复杂异构并行机调度问题,即带工件加工约束和序相关设置时间的异构并行机调度问题,提出一种分布估计算法,用于最小化最早完工时间。首先,合理借鉴了蜜蜂养殖中"双王分区春繁法"的思想,提出一种新的概率模型更新方式,并通过子种群概率模型的交叉融合构造采样概率模型,进而引导种群进化方向,用于提高算法全局搜索的深度;其次,设计了一种基于插入法的变异操作,用于保持分布估计算法的种群多样性水平,进而提高算法全局搜索的宽度;最后,引入基于插入法和首次改进跳出原则的局部搜索方法来增强算法的局部开发能力。仿真实验和算法比较验证了所提算法的有效性和鲁棒性。 Aiming at a kind of complex heterogeneous parallel machine scheduling problem that was Heterogeneous Parallel Machine Scheduling Problem with Job Processing Constraints and Sequence-dependent Setup Times (HPMSP_JPCSST) existed in process industry,an Estimation of Distribution Algorithm (EDA) was proposed to minimize the makespan criterion.By making reference to Double King Division Spring Multiplication (DKDSM) method,a new update mode of probability model was presented,and the sampling probability model was constructed by crossing and fusing the sub-probability model Thus the evolutionary direction of population was guided to improve the global search depth of the algorithm.An Insert-based mutation operation was designed to maintain the population diversity level,and the global search wide of the algorithm was improved.To enhance the local exploitation ability,the local search based on insertion method and first move strategy was introduced.Computational experiments and comparisons demonstrated the effectiveness and the robustness of proposed algorithm.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2013年第9期2202-2212,共11页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(60904081) 云南省中青年学术和技术带头人后备人才项目(2012HB011)~~
关键词 流程工业 分布估计算法 异构并行机 全局搜索 局部开发 process industry estimation of distribution algorithm heterogeneous parallel machine global search local exploitation
  • 相关文献

参考文献24

  • 1赵小强,荣冈.流程工业生产调度问题综述[J].化工自动化及仪表,2004,31(6):8-13. 被引量:29
  • 2刘波,王凌,金以慧.差分进化算法研究进展[J].控制与决策,2007,22(7):721-729. 被引量:290
  • 3周树德,孙增圻.分布估计算法综述[J].自动化学报,2007,33(2):113-124. 被引量:209
  • 4王圣尧,王凌,方晨,许烨.分布估计算法研究进展[J].控制与决策,2012,27(7):961-966. 被引量:70
  • 5金炳尧,蔚承建,何振亚.PBIL进化算法及其应用[J].浙江师大学报(自然科学版),1999,22(4):44-49. 被引量:7
  • 6汪存富,蔚承建.一种新的求解ATSP问题的PBIL算法[J].计算机工程与应用,2005,41(27):66-68. 被引量:4
  • 7ZHANG Q F, SUN J Y, TSANG E, et al. Estimation of distribution algorithm with 2-opt local search for the quadrat- ic assignment problem [J ]. Studies in Fuzziness and Soft Computing, 2006, 192: 281-292.
  • 8SALHI A, RODRIGUEZ J A V, ZHANG Q F. An estima- tion of distribution algorithm with guided mutation for a com- plex flow shop scheduling problem[C]//Proceedings of the Genetic and Evolutionary Computation Conference. New York, N. Y. ,USA:ACM,2007: 570-576.
  • 9PANG H L, HU K Y, HONG Z Y. Adaptive PBIL algo- rithm and its application to solve scheduling problems[C]// Proceedings of the IEEE International Conference on Com- puter Aided Control Systems Design. Washington, D. C., USA:IEEE, 2006:784-789.
  • 10JARBOUI B, EDDALY M, SIARRY P. An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems [J].Computers Operations Research, 2009, 36(9): 2638-2646.

二级参考文献277

共引文献642

同被引文献70

  • 1刘新亮,张涛,郭波.基于分布估计算法的备件优化配置[J].系统工程理论与实践,2009,29(2):144-150. 被引量:9
  • 2庞哈利,万珊珊.并行流程车间调度问题及其概率学习进化算法[J].控制理论与应用,2005,22(1):149-152. 被引量:3
  • 3周树德,孙增圻.分布估计算法综述[J].自动化学报,2007,33(2):113-124. 被引量:209
  • 4王凌,钱斌.混合差分进化与调度算法[M].北京:清华大学出版社,2012:33-48.
  • 5PINEDO M. Scheduling: Theory, Algorithms, and Systems [M]. Berlin: Springer, 2012.
  • 6YANG D L, YANG S J. Unrelated parallel-machine scheduling prob- lems with multiple rate-modifying activities [J]. Information Sci- ences, 2013, 235(12): 280 - 286.
  • 7HSU C J, CHENG T C E, YANG D L. Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total com- pletion time [J]. Information Sciences, 201 l, 181(20): 4799 - 4803.
  • 8SUNDARARAGHAVAN P S, KUNNATHUR A S, VISWANA- THAN I. Minimizing makespan in parallel flowshops [J]. Journal of the Operational Research Society, 1997, 48(8): 834 - 842.
  • 9JIANG Y, WAN S. Parallel flow shop scheduling problem using quan- tum algorithm [C] // Proceedings of the International Conference on Applied Informatics and Communication, ICAIC 2011. Xi'an: Springer, 2011:269 - 274.
  • 10LEI D. Multiobjective production scheduling: a survey [J]. The In- ternational Journal of Advanced Manufacturing Technology, 2009, 43(9/10): 926 - 938.

引证文献8

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部