大断面双线地铁隧道内撑拆除和二衬施作时机优化分析 被引量:3

Optimization analysis of the internal-support removal for a double metro tunnel with large sections and the construction time of secondary lining
下载PDF
导出
摘要 以长沙市轨道交通2号线溁湾镇站停车区间暗挖段为依托,基于有限元软件,对双侧壁导坑法施工内撑拆除和二衬施作时机不同施工工况进行了施工过程仿真模拟.通过对比分析,指出了适合现场实际的内撑拆除方式,确定了优化的二衬施作时机.该分析结果可以指导现场施工,也可以在后续类似工程施工中采用. Based on the Changsha Metro Line 2 Yingwanzhen Parking zone excavation tunnel,the finite element software is used for optimization analysis of the double-side- wall heading construction method internal-support removal and the construction time of secondary lining. Based on the results of the finite element numerical analysis,the appro- priate way of internal-support removal is chosen and the construction time of secondary lining is determined. The results can be used for the guidance of the site operation and can be provided as the reference for similar engineering.
出处 《交通科学与工程》 2013年第3期40-45,共6页 Journal of Transport Science and Engineering
关键词 双侧壁导坑法 内撑拆除 二衬施作时机 优化分析 double-side-wall heading method internal-support removal construction time of secondary lining optimization analysis
  • 相关文献

参考文献7

二级参考文献49

共引文献178

同被引文献11

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部