南水北调典型倒虹吸防冰塞安全运行试验 被引量:10

An experimental study on ice jam prevention of typical inverted siphon for South-to-North Water Diversion Project
下载PDF
导出
摘要 研究倒虹吸等局部水工建筑物的防冰塞安全运行条件对于南水北调输水工程的冰期安全运行有着重要的意义。通过真冰条件下的倒虹吸冰水动力学试验,模拟了不同水力条件时冰块在倒虹吸进口前的堆积和演变过程,得到了倒虹吸防冰塞安全运行时各相关水力参数间的关系。根据实验结论对南水北调中线工程京石段倒虹吸的冰期输水能力和调控进行了分析,为该输水工程倒虹吸冰期的安全运行提供参考。 For the safe operation of South-to-North Water Diversion Project, ice jam prevention of inverted siphon anti other partial hydraulic structures is very important during the period of an icing event. The ice jam process at the en- trance of inverted siphon is simulated by ice-hydrodynamics experiments under real ice conditions. The hydraulic con- ditions of ice jam prevention are obtained. Using the experimental data, the water diversion capacity and control regu- lations of inverted siphons for the Beijing-Shijiazhuang section of South-to-North Water Diversion Project are analyzed. This study provides a valuable reference for the safe operation of the project during the period of an icing event.
出处 《水科学进展》 EI CAS CSCD 北大核心 2013年第5期736-740,共5页 Advances in Water Science
基金 国家自然科学基金资助项目(51209233 51179209)~~
关键词 倒虹吸 安全运行 冰塞 输水能力 南水北调 inverted siphon safe operation ice jam water diversion capacity South-to-North Water Diversion Project
  • 相关文献

参考文献11

二级参考文献80

共引文献67

同被引文献148

引证文献10

二级引证文献125

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部