摘要
针对城市地铁工程巨额投资的问题,结合北京地铁复八线的建设,从提高线路标高和车站型式多样化两方面进行研究,以降低地铁工程建设投资,加快城市快速轨道交通系统建设进程。
In the light of the huge investment amount for urban subway project and in combination with the construction of the Beijing subway Fuxingmen - Bawangfen line, studies are carried out in the two aspects of raising the line elevation and multiplying the station models so as to reduce the investment for the construction of subway project and speed up the process of construction for the express rail transit system.
出处
《中国铁路》
2000年第6期42-43,55,共3页
China Railway