摘要
目前GIS的变电站经常分期建设投入运行,针对GIS扩建对接的方式进行优缺点分析,根据现场实际运行、检修经验对GIS对接常见问题进行了说明、分析。
In view of the GIS substation currently building and putting into operation always in different times,an analysis of advantages and disadvantages of the way the GIS expansion and docking is discussed on this paper.Besides,common questions in the process of GIS docking are studied and analyzed according to the actual operation and maintenance experience.
出处
《山东电力技术》
2013年第5期42-43,55,共3页
Shandong Electric Power
关键词
GIS
扩建
对接
GIS
expansion
docking