摘要
采用相关因素分析法及解析法对陈四楼煤矿矿井涌水量进行了分析预计,并结合矿井实际涌水量情况,得出该矿近年实际涌水量已平稳,矿井正常涌水量为951 m3/h,矿井最大涌水量为1 873 m3/h,该水量预计比较切合实际、结果可靠。
By using correlation factor analysis method and analytic method, Chensilou coal mine water inflow was analysed and forecasted, and combined with the actual situation of the mine water inflow, a conclusion is reached that the water inflow has been stable, normal water inflow of the mine is 951 m3/h, the maximum water inflow of the mine is 1 873 m3/h, the expected results is relatively practical and reliable.
出处
《山西焦煤科技》
2013年第9期66-68,共3页
Shanxi Coking Coal Science & Technology
关键词
陈四楼煤矿
相关因素分析法
解析法
矿井涌水量
Chensilou coal mine
Correlation factors analysis method
Analytic method
Mine water inflow