期刊文献+

ZL50装载机动力性能和经济性能评价指标研究 被引量:2

Study on Appraisal Index of Power Performance and Economic Performance of ZL50 Loader
下载PDF
导出
摘要 为提高装载机性能评价的适时性和有效性,文章结合装载机的实际工况特点、发展趋势和现有国家标准,在原有装载机动力性能和经济性能评价的基础上,对装载机加速过程、原地爬坡、自动换挡品质及复合动作油耗等方面的评价指标进行了补充,有效地满足了装载机性能评价要求。 In order to improve the timeliness and effectiveness of performance appraisal of loader, the appraisal indices including acceleration process, in-situ climbing, automatic shift and fuel consumption of composite motions were appended to original appraisal indices of power performance and economic performance combined with actual working conditions, development trend and current national standards, which sufficiently satisfies the requirement of performance appraisal of loader.
出处 《筑路机械与施工机械化》 2013年第10期93-96,101,共5页 Road Machinery & Construction Mechanization
基金 教育部博士点基金(20110205110002) 中央高校基金(CHD2011TD017)
关键词 装载机 动力性能 经济性能 评价指标 loader power performance economic performance appraisal index
  • 相关文献

参考文献5

  • 1JB/T3688.1-1996,轮式装载机基本参数.
  • 2JB/T3688.2-1998,轮式装载机技术条件.
  • 3JB/T3688.3-1998,轮式装载机试验方法.
  • 4杨世敏,张铁.工程机械地面力学与行驶理论[M].西安:陕西科学技术出版社,2004.
  • 5胡小锋,闫杉.基于分解策略的装载机装配线平衡研究[J].中国科技论文,2012,7(8):607-611. 被引量:1

二级参考文献15

  • 1Becker C,Schol A. A survey on problems and methods in generalized assemblylinebalancing[J].EurJOperRes,2006,(03):694-715.
  • 2Lee T O,Kim Y,Kim Y K. Two-sided assembly line balancing to maximize workrelatednessandslackness[J].ComputIndEng,2001,(03):273-292.
  • 3Bartholdi J J. Balancing two-sided assembly lines:a case study[J].International Journal of Production Research,1993,(10):2447-2461.
  • 4Hu Xiaofeng,Wu Erfei,Bao Jinsong. Abranch-and-bound algorithm to minimizethelinelengthofatwo-sidedassemblyline[J].EurJOperRes,2010,(03):703-707.
  • 5Wu Erfei,Jin Ye,Bao Jinsong. A branch-and-bound algorithm for two-sided assembly line balancing[J].International Journal of Advanced Manufacturing Technology,2008,(9/10):1009-1015.
  • 6U?ur,Bilal T. Multiple-criteria decision-making in two-sided assembly line balancing:A goal programming and a fuzzy goal programming models[J].ComputOperRes,2009,(06):1955-1965.
  • 7Kim Y K,Kim Y,Kim Y J. Two-sided assembly line balancing a genetic algorithmapproach[J].ProdPlannControl,2000,(01):44-53.
  • 8KimYK,SongWS,KimJH. Amathematicalmodelandageneticalgorithm for two-sided assembly line balancing[J].Computers and Operations Research,2009,(03):853-865.
  • 9Baykasoglu A,Dereli T. Two-sided assembly line balancing using an ant-colony-based heuristic[J].International Journal of Advanced Manufacturing Technology,2008,(5/6):582-588.
  • 10Simaria A S,Vilarinho P M. 2-ANTBAL:an ant colony optimisation algorithm for balancing two-sided assembly lines[J].Computers & Industrial Engineering,2009,(02):489-506.

同被引文献6

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部