摘要
讨论如何改革接触网镀锌钢管腕臂的人工安装方法,合理解决好安全、质量、进度、效益的问题。
The paper discusses the method how to improve the manual installation of the zinc coated steel tubular cantilevers of overhead contact system, rationally handle with the issues concerning safety, quality, progress and benefit.
出处
《电气化铁道》
2013年第4期11-13,共3页
Electric Railway
关键词
镀锌钢管腕臂
人工安装
新方法
Zinc coated tabular cantilever
manual installation
new method