摘要
本文主要根据标准GB/T5576-2008低压成套无功功率补偿装置,介绍了动态响应时间检测项目试验方法与原理。并对在试验过程中可能发生补偿不到位等故障进行分析介绍。利用茹科夫线圈采集补偿电流波形时间参数,以及利用SP控制器控制配电线路负载端导通时间与停止。通过分析介绍,可以提高在检测此项目的试验效率。
mainly according to the standard of GB/T5576-2008 low voltage complete sets of reactive power compensate device,this article introduces the test method and principle of dynamic response time detection project.It introduces and analyses the failure which would happen in the test process,such as compensation does not reach the design value.Making the Use of shavings cove coil to gather the time parameter of compensated current waveform,and making the use of SP controller to control the conduction time and stop of distribution line load end.Through the analysis of introduction,we can improve the test efficiency of this project detection.
出处
《电气技术》
2013年第9期76-78,共3页
Electrical Engineering
关键词
低压无功功率补偿
动态响应时间
波形
SP控制器
low voltage reactive power compensation
dynamic response time.waveform
SP controller