摘要
永镇水库工程是山东省黄河三角洲农业综合开发项目中的重点工程,采用的垂直铺塑防渗深度达到16m多,是目前山东平原水库工程中铺塑最深的工程。本文介绍了垂直铺塑防渗机理、施工机械、施工工艺、质量控制等内容,为其他类似工程设计和施工提供借鉴作用。
Yong Town Reservoir Engineering is one of the key projects in Yellow River Delta Comprehensive Agricultural Development Project in Shandong Province.The seepage control depth of vertical plastic pavement is up to 16m or more,which is the deepest project of plastic pavement in Shandong plain reservoir projects currently.Vertical plastic pavement seepage control mechanism,construction machinery,construction process,quality control,etc.,are introduced in the paper,thereby providing reference for designing and constructing other similar projects.
出处
《水利建设与管理》
2013年第9期16-18,12,共4页
Water Conservancy Construction and Management
关键词
永镇水库
垂直铺塑
施工
质量控制
Yong Town Reservoir
vertical plastic pavement
construction
quality control