期刊文献+

乌克塔斯水库坝基渗水原因分析与处理

Analysis of Water Seepage Reason in Ukraine Tasman Reservoir Dam Foundation and Solutions
下载PDF
导出
摘要 近两年来,自治区为改善和提高牧民生活水平,兴建了几十余座小型水库。由于勘察设计和施工周期短,部分水库建设完成后,水库初期蓄水期间,大坝后坡脚处出现较多的渗水现象,影响了水库运行和功能发挥。本文主要介绍新疆乌克塔斯水库坝基渗水问题出现后所采用的勘察和分析方法,及如何较准确地查明坝基渗漏的分布位置及规模,以期为今后类似工程的分析与处理提供参考。 Dozens of small reservoirs are established in the autonomous region in the past two years in order to improve and enhance herder living standards.Since survey and design as well as construction cycle is short,the rear slopes of the dams have frequent water seepage problems during the initial water accumulation period of the reservoirs after some reservoirs are constructed,thereby affecting operation and functioning of the reservoirs.Survey and analysis methods adopted for the water seepage problems of Xinjiang Ukraine Tasman Reservoir Dam Foundation,and the approach of accurately discovering distribution positions and scales of dam foundation leakage are mainly described in the paper,thereby providing reference for analyzing and treating similar projects in the future.
作者 金英春
出处 《水利建设与管理》 2013年第9期59-63,81,共6页 Water Conservancy Construction and Management
关键词 坝基渗水 钻孔压水 渗流量 水位观测 灌浆 dam foundation water seepage drilling water pressing seepage flow capacity water level observation grouting
  • 相关文献

参考文献2

  • 1GB50021-2001.岩土工程地质勘察规范[S].北京:中国建筑工业出版社,2001.
  • 2王安明,杨青.新疆和布克赛尔蒙古自治县乌克塔斯水库工程大坝渗漏原凶分析报告[R].2010.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部