摘要
介绍了松溪供水工程概况,分析了工程建设的必要性。根据实测资料,论述了工程设计洪峰、24h洪量及三日洪量的计算方法。松溪供水工程按有资料地区考虑,采用适线法进行计算。
Considering the situation of water supply engineering in Songxi, this paper analyzes the necessity of engineering construction.Based on available data, the calculation methods are discussed involving design flood peak, design flood volume in 24 hours and design flood volume in three days. Curve-fitting method is used to calculate design flood peak and design flood volume of water-supply engineering in Songxi with available data.
出处
《水科学与工程技术》
2013年第5期6-9,共4页
Water Sciences and Engineering Technology
关键词
水库
实测资料
洪峰流量
洪量计算
reservoir
measured data
peak discharge
flood volume