摘要 针对北排河挡潮闸运行多年接近折旧年限,且该闸所处环境恶劣,常年风蚀、海水侵蚀、冻融破坏,地面沉降、交通桥车辆荷载增大、河道淤积等,工程存在的安全隐患,通过除险加固工程设计,采用新材料进行缺陷处理,使其继续发挥效益。 The tide gate in Beipai River has been operated for many years and is close to depreciation year, where the environment is poor, and also is of perennial wind erosion, marine corrosion, freezing and thawing destroy. Because of ground subsidence, transportation vehicle load increasing, river channel sedimentation, etc,the potential safety danger exists in the project. We try to make it continue to play its benefits through reinforcement project design and using the new material for defect treatment.
作者 魏艳秀
出处 《水科学与工程技术》 2013年第5期23-25,共3页 Water Sciences and Engineering Technology
关键词 挡潮闸 软基建闸 除险加固 tide gate soft foundation gate reinforcement
  • 相关文献

参考文献7

  • 1GB50367-2006,混凝土结构加固设计规范[S].
  • 2SL265-2001.水闸设计规范[S].[S].,..
  • 3SL191-2008,水工混凝土结构设计规范[S].
  • 4SL214-98.水闸安全鉴定规定[S].[S].,..
  • 5河北省水利水电勘测设计研究院.北排河挡潮闸安全鉴定报告[R].2009.
  • 6河北省水利水电勘测设计研究院.北排河挡潮闸出险加固工程初步设计[R].2011.
  • 7孙志恒,鲁一晖.水工混凝土建筑物检测与修补加固技术[M].北京:中国水利水电出版社,2011.

共引文献972

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部