摘要
以白俄罗斯奥希波维奇—日洛宾电气化项目为例,介绍了两国接触网技术标准差异,从接触网系统设计角度出发,通过计算和分析,对接触网系统方案进行优化设计,有效控制技术标准差异带来的潜在技术风险,实现国产接触网系统与境外铁路项目的无缝对接。
The electrifical railway project of Osipovichi-Zhlobin in Belrus has been taken to be an example to introduce the difference of overhead contact system between Belrus and China.After optimization of overhead contact system design with calculation and analysis,possible technique risk caused by difference of technique standard has been controlled efficiently,and domestic overhead contact system has connected with international railway project completely.
出处
《电气化铁道》
2013年第5期6-9,14,共5页
Electric Railway
关键词
接触网
应用
系统设计
优化
overhead contact system
application
system design
optimization