2Shi Q.H., Hydraulic design of Three Gorges right bank powerhouse turbine for improvement of hydraulic stability [C], Proceedings, 25th IAHR Symposium, Timisoara, Romania; 2010, 1755-1315/12/1/012006.
3Wang Y.L., Li G.Y., Shi Q.H. and Wang Z.N., Hydraulic de- sign development of Xiluodu Francis turbine [C], Proceed- ings, 26thlAHR Symposium, Beijing, China; 2012,.IAHR_XXIV-231.
4Wang Z.N., Luo X.Q., Guo P.C and Wang Y.N., Hydraulic development of the turbine for Gibe [I[ in Ethiopia [J], The International Journal on Hydropower & Dams, Vol. 20, NO. 2, 2013:46-50.
5Huang Y.F., Liu G.N., and Fan S.Y., Research on prototype hydro-turbine operation [M], Beijing, Foreign Language Press Co Ltd; 2012:3-4.