CEFR热传输及发电能力分析 被引量:1

Analysis of Heat Transfer and Power Generation Capacity for CEFR
下载PDF
导出
摘要 针对中国实验快堆(CEFR)发电能力问题,对CEFR 3条回路的输热能力及热电转换能力进行建模并分析计算,通过40%额定功率发电工况下的试验数据验证了所建模型的正确性。依据CEFR的实际情况,提出优化运行工况的改进措施,其效果得到了汽轮发电机组厂家数据的验证,并结合输热能力验证模型模拟CEFR满功率下的热传输及发电能力。结果表明:基于优化后的运行工况,CEFR热传输系统和热电转换系统可达到设计要求。 In view of CEFR’s power generation matter ,the heat transfer and the power generation capacity for three loops of CEFR were modeled and analyzed ,and the cor-rectness of models was verified with the experimental data under 40% rated power gen-eration condition .Based on CEFR’s real situation ,the improvements to optimize opera-tion conditions were suggested and the results were validated with the turbine data from manufacturers .Combined with the heat transfer capacity model ,the heat transfer and power generation capacity of CEFR at full power were simulated .The results show that the heat transfer system and power generation system fulfill the design requirements un-der the optimized operating conditions .
出处 《原子能科学技术》 EI CAS CSCD 北大核心 2013年第10期1773-1777,共5页 Atomic Energy Science and Technology
关键词 输热及发电能力 优化 运行工况 试验验证 heat transfer and power generation capacity optimization operating condition experimental verification
  • 相关文献

参考文献4

  • 1徐銤.我国快堆技术发展的现状和前景[J].中国工程科学,2008,10(1):70-76. 被引量:21
  • 2胡颂德.蒸汽发生器设计说明书[R].北京:中国原子能科学研究院,1997.
  • 3BROWN G A. Thermal hydraulic analysis for the CDFR steam generator unit (a once-through boiler) using the Besant computer code[R]. Harrogate: Boiler Dynamics and Control in Nu- clear Power Station, 1985.
  • 4KAMBOJ B K. Two phase flow and heat transfer in a once-through steam generate during auxiliary feedwater injection[J]. Nuclear Technology, 1992, 100: 347-358.

二级参考文献3

  • 1赵仁恺.中国快堆技术发展[M].北京:"八六三"计划能源领域专家委员会,1996
  • 2徐銤.PWR-FBR闭式燃料循环实现我国核能持续供应.中国前沿能源动力工程(英文),2007,1(2):129-134.
  • 3徐銤.我国快堆技术研究和发展.核工程和技术(英文),2007,39(3):187-192.

共引文献20

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部