摘要 泄洪洞工程设计为大断面、大流量、高流速,对混凝土表面不平整度和抗冲耐磨要求高,温控防裂难度大。为保证底板及边墙交接部位的良好结合,工程施工过程中,通过研究采用"L"型模板,改进振捣、抹面、压光等施工工艺,保证了底板及边墙混凝土的施工质量和表面平整度,值得其他工程借鉴。 The spillway tunnel is designed as large section,high flow and high velocity,unevenness of concrete surface,so scour and abrasion resistance and temperature control and crack resistance are required. To ensure good connection between invert and side wall,L-shaped forms are used to improve vibration,finish and hard finish so as to ensure high construction quality and surface evenness of invert and side wall. This construction technology will give references to other similar projects.
作者 刘英 唐杰伟
出处 《四川水力发电》 2013年第5期12-14,164,共3页 Sichuan Hydropower
关键词 溪洛渡水电站 泄洪洞 无压段底板 边墙 “L”型边墙模板 spillway tunnel invert in free flow section side wall L-shaped form for side wall
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部