渠道衬砌施工技术与质量控制 被引量:1

Channel Lining Construction Technology and Quality Control
下载PDF
导出
摘要 南水北调工程面对工期紧、任务重、战线长、难度大等诸多因素的严峻考验,渠道衬砌施工水平参差不齐,施工组织困难,质量管理跨度大。通过对衬砌施工过程中各工序技术控制要点的研究,在施工过程中建立了质量管理体系,保证了渠道衬砌施工质量,减少了后期缺陷处理成本,为类似同等大型工程提供了参考和借鉴依据。 South-north Water Diversion Project faces great challenges,such as short construction period,heavy tasks,long distance and great difficulties and so on. Channel lining construction levels are different,construction organization is also difficult and quality management is so hard. However,studies were conducted for control points of different procedures during lining construction and quality management system was established during construction to ensure construction quality for channel lining and reduce cost for later defect treatment. This experience will give references for similar large-sized project.
出处 《四川水力发电》 2013年第5期52-53,164,共2页 Sichuan Hydropower
关键词 渠道衬砌 施工技术 质量控制 南水北调 channel lining construction technology quality control south-north water diversion
  • 相关文献

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部