北方某地区突降大雪,导致源安Ⅰ线和源霸2条线路跳闸,仅剩源安Ⅱ线运行,保留#4机组、#8机组300 MW负荷运行。托电公司迅速组织骨干力量,启动应急预案,采取了有效的防范措施,以确保剩余机组的安全、稳定运行。
A heavy snow suddenly occurred in a north region, and this caused the transmission line trip-out accidents of YuanAn Line I and two Yuan-Ba lines. Only the Yuan-An Line II remained in working condition,and the unit No. 4 and unit No. 8 still were operating with 300 MW load. Togtoh Power Generation Company Limited quickly organized related professionals,started the emergency plan,and adopted effective preventive measures, which ensured the remained units to operate safely and stably.