期刊文献+

大跨度钢管混凝土拱桥拱肋吊装施工索力计算方法探讨 被引量:5

The Calculating Method Discussion on the Lifting Construction Cable Force of Longspan Concrete-filled Steel Tubes Arch Bridge and Arch Rib
下载PDF
导出
摘要 结合南充市下中坝嘉陵江大桥,选取三种索力计算方法对拱肋吊装施工过程进行仿真分析,通过对计算结果的比较分析,选取一种最方便合理的方法,可供本桥以及类似工程索力计算参考。 Considering the bridge on Jialing River at the dam of medium - and low - height in Nanchong City, three cable force calculating methods are chosen to make a simulated analysis on the working progress of the arch rib lifting. After comparison and analysis of the calculating results, the most convenient and reasonable method is chose, which can be a reference to this bridge or similar project cable force calculation.
出处 《北方交通》 2013年第10期29-32,共4页 Northern Communications
关键词 钢管混凝土拱桥 斜拉扣挂施工 拱肋吊装 吊装索力计算 Concrete - filled steel tubes arch bridge Cable - stayed construction Arch rib lifting Liftingcable force calculation
  • 相关文献

参考文献1

  • 1范立础.桥梁工程[M].北京:人民交通出版社,2001..

共引文献502

同被引文献32

引证文献5

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部