低渗透性深厚淤泥散杂货堆场分期预压技术研究 被引量:1

Staging Preloading Technology Research of Dulk Yard for the Low Permeability Deep Silt
下载PDF
导出
摘要 江苏金港湾国际物流园区建于连云港市沿海的深层软土上,堆场荷载较大,为探寻在软土中施工的经济合理的施工方案,对B型散杂货堆场的软基采用"分期(施工期+运营期)堆载预压"技术进行处理,结合研究,证明该方法是合理有效的,不仅保证了质量,而且降低了造价。 Jiangsu Jingangwan International Logistics Park was built in Lianyungang City deep soft soil, the loads is large, In order to explore the economic and reasonable construction scheme in the soft soil, "Staging(Construction period and operation period) preloading" are used to processing the soft soil of the type B Bulk Yard soft foundation, combined with the researches, Proved this method is reasonable and effective,We not only guaranteed the quantity of the reconstruction project, and the cost is lower.
出处 《科技通报》 北大核心 2013年第10期149-152,共4页 Bulletin of Science and Technology
基金 江苏省建设厅基金项目(JS2008ZD03)
关键词 低渗透性深厚淤泥 分期预压 技术研究 low permeability deep silt staging preloading technology research
  • 相关文献

参考文献6

二级参考文献25

共引文献71

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部