摘要
结合大修期间相关设备的拆检情况,对尿素装置低压系统运行不正常的原因进行分析,并予以解决。
Based on the removal and examination during overhauling, analyze the reasons for abnormal operation of low pressure unit of urea plant, and slove the problems.
出处
《化工设计通讯》
CAS
2013年第5期55-56,共2页
Chemical Engineering Design Communications
关键词
低压系统
问题
原因分析
检查
low pressure unit
problem
analyzing the reasons
overhauling