100m高钢筋混凝土烟囱定向爆破拆除 被引量:3

DIRECTIONAL BLASTING DEMOLITION OF A 100-METER-HIGH REINFORCED CONCRETE CHIMNEY
下载PDF
导出
摘要 采用定向控制爆破技术成功拆除了100m高钢筋混凝土烟囱。预先用爆破法开设定向窗和减荷槽,在保证余留截面稳定性的前提下对切口范围内的支撑体实施爆破,使烟囱按预定方向倒塌。爆破效果表明,松软农田有利于减小烟囱前冲、降低触地振动,可为同类工程提供借鉴。 A 100m reinforced concrete chimney was demolished successfully by directional blasting tech- nique. In order to make the chimney collapsed according to the designed direction, the directional windows and load reducing groove were pretreated and then the supporting body within the range of cut was blasted based on the stability of remaining sections was insured. The blasting effect showed that the soft farmland was helpful to reduce forward rush and touchdown vibration of the chimney. It could provide a reference for similar projects.
出处 《工程爆破》 北大核心 2013年第5期35-37,57,共4页 Engineering Blasting
关键词 钢筋混凝土烟囱 爆破拆除 定向爆破 前冲 触地振动 Reinforced concrete chimney Blasting demolition Directional blasting Forward rush Touchdown vibration
  • 相关文献

参考文献7

二级参考文献24

共引文献36

同被引文献12

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部