摘要
分别论证了主体设计方案、建设用地方案、管线保护与搬迁方案等市区地下交通设施建设工程前期筹划要点,并以上海市某地铁车站建设筹划为例,介绍了确定其总体方案的详细过程,最后总结了市区地下工程前期筹划的主要思路。
In this paper, the main points of the front-stage work in the investor' s management is studied, including the design program, land use program, pipeline relocation program etc. Furthermore, a front-stage planning of a metro station in Shanghai is displayed and analyzed, and the main points of the planning are concluded at the end of the paper.