为快速准确地进行EPC项目计价,基于对传统的各个阶段计价方法研究,依据设计概算计价中的类似工程预算法的计算理论,建立初步的EPC计算模型;再通过工程项目分解、计算机修正指标等方法提高其计算精度,从而建立类似分项工程计价理论.通过对运用该方法计价的项目进行数据统计,有97.5%的分项工程计价在受控范围内,可有效地解决"一次计价""固定总价"的难题.
In order for quick and accurate EPC project valuation, a preliminary calculation model was set up based on the estimate budgetary method and traditional mature valuation methods. The calculation accuracy was further improved by the project break-downs and computer corrective index so as to set up the valuation methods for the similar EPC subdivisional works. As per the data statistics collected from the projects applied this method, 97.5% of subdivisional works was under control and the problems like "lump sum" and "fixed total price" can be settled effectively.