摘要
以上海通用汽车研发中心动态广场道路工程中8 700 m2瓷砖路试验路段为工程背景,针对大面积瓷砖路的施工难点,结合工程实际,从预制块磨具制作、预制块拼装、灌浆料的加注和施工过程中的检测等方面阐述如何确保工程质量达到设计要求。同时,对大面积瓷砖路的施工工艺进行了探索和经验总结。
Taking the tested 8700-m2 tile road section in the dynamic square road project of Shanghai General Motors Research & Development Center as the engineering background, aiming at the construction difficulties of the large-area tile road and combined with the engineering practices, the article sets forth how to ensure the engineering quality to satisfy the design requirements from the aspects of the fabrication of precast block mould, assembly of precast block, filling of grouting material and inspection in the construction process. Also the article discusses the construction technology of large-area tile road and sums up its experience.
出处
《城市道桥与防洪》
2013年第9期154-156,14,共3页
Urban Roads Bridges & Flood Control
关键词
瓷砖路
施工工艺
平整度指标
模具制作
拼装
灌浆料加注
tile road
construction technology
roughness index
mould fabrication
assembly
filling of grouting material