摘要 赤道几内亚吉布洛水电站为我国援非工程之一,属于赤道几内亚国家电网的骨干电源,电站为低坝引水式电站,总装机容量为120 MW,装机4台,单机容量30 MW。电站结构为半地下式厂房,为大跨度、高边墙结构。设计采用外排水、设置后浇补偿收缩混凝土等优化措施,优化了电站结构,通过这些优化措施,降低了工程造价、保证了施工进度,为水电站的设计提供了良好的工程实践经验。 Djiploho hydropower station of Equatorial Guinea is one of the Chinese-aid-to-Africa projects,which is the core power source of state power grid of Equatorial Guinea. The station is a low dam diversion-type station, with a total installed capacity of 120MW(4 units in total with the single capacity of 30MW). It has semi-underground pow-erhouse, great span and high side-wall structure. The structure of powerhouse is optimized by the exterior drainage design,post-pouring of compensated shrinkage concrete and other optimization measures,which greatly reduce the project cost and guarantee the construction schedule,and can be well referenced by similar projects.
作者 孟旭央
出处 《红水河》 2013年第5期1-2,8,共3页 Hongshui River
关键词 援非工程 引水式电站 半地下式厂房 吉布洛水电站 Chinese-aid-to-Africa project diversion-type station semi-underground power Djiploho hydropower station
  • 相关文献

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部