期刊文献+

基于风险评估的配电网检修决策优化 被引量:35

Maintenance decision making optimization based on risk assessment for distribution system
下载PDF
导出
摘要 提出一种基于风险评估的配电网检修决策优化模型,有效地融合不同的检修方式,并综合考虑设备状态及其发展、各类检修的作用、电网的运行方式等因素。模型计及电网检修风险和电网故障风险,以电网运行风险最小为优化目标,以电网安全约束、检修关系约束和检修资源约束等为约束条件,并采用粒子群优化算法进行求解。RBTS-BUS2系统仿真结果验证了所提模型的合理性和有效性。 A model of maintenance decision making optimization based on risk assessment is proposed for distribution system,which effectively combines different maintenance methods together and comprehensively considers different factors,such as device state & its development,maintenance functions,grid operating modes,etc.With the consideration of grid maintenance and fault risks,it takes the minimum grid operation risk as its optimization objective and the grid safety,maintenance relation and maintenance resource as its constraints.The particle swarm optimization algorithm is adopted to solve the model.Its validity and effectiveness are verified by the simulative results for RBTS-BUS2 system.
出处 《电力自动化设备》 EI CSCD 北大核心 2013年第11期1-8,共8页 Electric Power Automation Equipment
关键词 状态检修 风险评估 检修风险 故障风险 粒子群优化算法 配电 优化 模型 决策 condition-based maintenance risk assessment maintenance risk fault risk particle swarm optimization algorithm electric power distribution optimization models decision making
  • 相关文献

参考文献19

二级参考文献186

共引文献1223

同被引文献329

引证文献35

二级引证文献336

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部