期刊文献+

岩溶地区码头嵌岩灌注桩的施工方案与技术经济比较 被引量:1

Technical and Economic Comparison of Construction Plan for Rock-embedding Driven Cast-in-place Pile in Karst Region
下载PDF
导出
摘要 结合长江中游某高桩码头扩建工程的嵌岩灌注桩施工案例,重点介绍在岩溶地区的嵌岩灌注桩成桩施工中应注意的主要问题,结合当地的自然和施工条件,通过技术经济比较确定合理的嵌岩灌注桩施工方案,采取必要的工程技术措施以保证施工质量、缩短工期和节省工程投资。 Based on the construction of rock-embedding driven cast-in-place pile m plied wharf extension project in the middle reaches of the Yangtze River, the problems that affect the construction of rock-embedding pile in karst region are introduced as key points. By referring to local natural and construction conditions, reasonable construction plan is determined through technical and economic comparison. Meanwhile, necessary technical measures are adopted to guarantee construction quality, shorten construction period and lower project investment.
作者 左莎 韩忠安
出处 《港工技术》 2013年第3期28-29,共2页 Port Engineering Technology
关键词 岩溶地区 码头 嵌岩灌注桩 施工方案 工程技术措施 karst region wharf rock-embedding driven cast-in-place piles construction plan techni-cal measures
  • 相关文献

参考文献2

  • 1JTSl47-4-2012港口工程桩基规范[S].北京:人民交通出版社.2012.
  • 2JTJ285-2000港口工程嵌岩桩设计与施工规程[S].北京:人民交通出版社,2000.

共引文献5

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部