摘要 结合土力学与爆炸力学理论,分析处理深厚淤泥爆破挤淤的机理。针对舟山市蚂蚁岛造船厂围堤工程运用爆破挤淤处理深厚淤泥的情况,介绍该工程的爆破技术参数的选取、施工工艺的控制以及钻孔检验、物探检验等,检验结果显示抛石体与淤泥的混合层均小于1.5 m,很好地达到了设计要求。 Combined with soil mechanics and mechanics of explosion theories, the mechanism of deep silt treatment by blas- ting was analyzed. In terms of the circumstances of blasting compaction treatment on deep silt for the retaining dyke project of Ant island shipyard, the authors discussed in detail about the blasting parameter selection, construction control, borehole test and ge- ophysical test etc. The results showed that the mixed layer of stone-filled and mud is less than 1.5 meters, which meets the de- sign requirements well.
出处 《船海工程》 2013年第5期204-207,共4页 Ship & Ocean Engineering
关键词 爆破挤淤 深厚淤泥 定向滑移法 围堤 软基处理 爆填 blasting compaction treatment deep silt directional slippage method retaining dyke project soft soil explo- sive fill construction
  • 相关文献

参考文献1

二级参考文献4

共引文献23

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部